Uzbekistan: Water Resources Management Sector Project

Projet terminé

In Uzbekistan agricultural production almost entirely depends on irrigation. The country is therefore compelled to using existing water resources much more efficiently, especially in irrigation, which consumes over 90% of the water. After the collapse of the Soviet Union the region inherited huge irrigation schemes, and the associated storage facilities were all managed centrally at that time. The newly independent states inherited a system of inefficient water management, seriously deteriorated infrastructure and poor institutional settings all coupled with the prevailing arid geo-climatic features of the region.

Modernisation des réseaux d’irrigation. Situation initiale: La DDC soutient divers projets visant à améliorer l’irrigation, l’approvisionnement en eau de la population rurale et la gestion de l’eau. Un projet pilote d’importance est par exemple en cours dans la vallée de Fergana, une région frontalière entre le Tadjikistan et l’Ouzbékistan. Dans le cadre du présent projet, on entend établir une collaboration avec la Banque asiatique de développement (BAD), afin de mener ce genre d’activités dans d’autres régions d’Ouzbékistan. Objectifs: Dans les régions sélectionnées, l’agriculture doit atteindre la stabilité financière, devenir plus productive et mieux respecter l’environnement. Mise en oeuvre: Le Gouvernement ouzbek a lui-même mis sur pied un organisme qui s’occupe des projets des pays donateurs dans le domaine du développement rural. Cette Agence de développement rural (RRA) assurera probablement la réalisation du projet. Le centre d’information scientifique SIC (Scientific Information Center), un partenaire de longue date de la DDC, joue également un rôle essentiel.

Pays/région Thème Période Budget
l'Asie centrale
Eau
Agriculture et sécurité alimentaire
Conservation des ressources en eau
Ressources en eau à usage agricole
Développement agricole
15.02.2010 - 31.12.2015
CHF  3’120’000
Contexte

Switzerland is implementing the WRMSP Component 2: Improved Water Resources Management. The Swiss funded component development objective– which is in line with SDC water sector objectives - is to increase the productivity and financial and environmental stability and the profitability of agriculture in the project areas. As such it contributes to improved effectiveness of water resources management and to the further development of private farming, more secure livelihoods, increased environmental stability, and greater social harmony

Objectifs

The WRMSP project intends to sustain and increase agricultural production and productivity in Uzbekistan by making selected pump irrigation systems fully functional and operating in an efficient manner.

Groupes cibles
  • Basin Administrations of Irrigation Systems
  • Administrations of Irrigation Systems
  • Water Consumer Associations
  • Farmer Field Schools
Effets à moyen terme

SDC’s contribution focuses on the soft component of this major ADB project, and further promotes IWRM, strengthens capacities of 3 Basin Administrations of Irrigation Systems (BAIS), 4 Administrations of Irrigation Systems (AIS) and 34 Water Consumer Associations (WCA), establishes and equips 20 Farmer Field Schools (FFS) to disseminate best water saving practices.

Résultats

Principaux résultats attendus:  

The benefits for each subproject will be i) improved agricultural production through rehabilitation and restoration of infrastructure and appropriate irrigation services preventing the possible abandonment of land; ii) increased energy efficiency through more efficient motors and pumps; iii) improved water management practices, water use efficiency and water productivity; iv) decreased land degradation through improved irrigation and drainage management; v) positive impact on climate change through mitigation (less consumption of thermally produced electricity and thus emissions with new pumps) and adaptation (more efficient water use). 

The Swiss participation in the WRMSP project will enhance effective use of available assets and resources, thus making a valuable contribution to supporting the agricultural sector of Uzbekistan.


Direction/office fédéral responsable DDC
Crédit Coopération avec l'Europe de l'Est
Partenaire de projet Partenaire contractuel
Secteur privé
  • Secteur privé suisse


Autres partenaires
  • Ministry of Agriculture and Water Resources of the Republic of Uzbekistan
  • Asian Development Bank
  • Project Management Office
Budget Phase en cours Budget de la Suisse CHF    3’120’000 Budget suisse déjà attribué CHF    2’656’581
Phases du projet

Phase 1 15.02.2010 - 31.12.2015   (Completed)