China: Groundwater Rehabilitation under a changing climate

Proyecto terminado

In the past 30 years the aquifers in the semi-arid North China Plain have been greatly overexploited. Climate change is increasing the drought problem. The project assesses measures to establish a long-term balanced regional water budget by water imports and water saving and applies complementary use of precipitation, surface water and groundwater. The system is based on real-time monitoring of groundwater tables and pumping rates and controlling pumping wells via a quota system. The insights of this project can be applied also in other countries.

Región/País Tema Período Presupuesto
China
Agua
Cambio climático y medio ambiente
Preservación de los recursos hídricos
Política del sector del agua
Environmental policy
15.03.2014 - 31.07.2018
CHF  6’057’740
Contexto

In arid and semi-arid regions, reliable agricultural production is only feasible with irrigation. Groundwater, being the only water resource available all year round, is more and more under stress. Only under strict management, aquifers will be able to relieve droughts reliably. China severely suffers from this problem. Additionally, droughts and heat waves increased by climate change, impact on the availability of water. In order to guarantee the availability of water, particularly for food security, a groundwater management system must be established.

Objetivos

To strengthen the adaptation capacity to climate change  by supporting better groundwater management through real-time monitoring, modeling and controlling in areas under water stress.

Grupos destinarios
  • Poor farmers in the project pilot region, who have to pay more for groundwater pumping with increasing drawdown and whose income will suffer from climate variability.
  • Local water user associations and water authorities, whose water management work will be made more efficient with better management tools.
  • National research and policy advising institutes.
Efectos a medio plazo
  • Outcome 1 Providing the data and information base for real-time water allocation.
  • Outcome 2 Developing and implementing an integrated real-time monitoring, modeling and controlling system to prevent groundwater depletion and build up adaptation capacity to climate change.
  • Outcome 3 Policy options are elaborated through dialogues with the stakeholders and implemented by the local authorities.
  • Outcome 4 Improved knowledge of using real-time monitoring, modeling and controlling system to prevent groundwater depletion for arid regions in developing countries.
Resultados

Resultados de las fases anteriores:  

  • The project structure has been set up with national and sub-national stakeholders.
  • Project areas have been delineated.
  • Data collection, base model set up, initial assessment of the current infrastructure and monitoring system, design of data base and data platform.


Dirección / Officina Federal responsable COSUDE
Crédito Cooperación al desarrollo
Contrapartes del proyecto Contraparte del contrato
Sector privado
Institución estatal extrangera
Institución académica y de investigación suiza
  • ETHZ Zurich
  • National State Institute North
  • Sector privado suizo
  • Sub-National State SouthEast


Presupuesto Fase en curso Presupuesto suizo CHF    6’057’740 Presupuesto actual suizo ya emitido CHF    6’022’636 Total del proyecto desde la primera fase Presupuesto inclusive contrapartes del proyecto CHF   7’970’000
Fases del proyecto Fase 2 01.09.2018 - 31.12.2022   (Completed)

Fase 1 15.03.2014 - 31.07.2018   (Completed)