Improving the National Urban Search and Rescue (USAR) capacities of Mongolia
The intervention seeks to improve the national emergency response capacities of Mongolia in the area of Urban Search And Rescue (USAR). In Mongolia USAR services are delivered by the National Emergency Management Agency (NEMA). Capacity-building will be pursued through a selection of measures with special focus on the provision of simple training facilities, targeted training in USAR techniques as well as support for organizational and operational conceptualization.
Pays/région | Thème | Période | Budget |
---|---|---|---|
Mongolie |
Changement climatique & environnement
Réduction des risques de catastrophes
|
01.01.2019
- 31.12.2019 |
CHF 210’000
|
- Establishment of several NEMA working groups for project implementation
- Identification, recruitement and employment of 12 new USAR trainers
- Planning and tendering of a new Modular Training Ground (MTG) for practical USAR trainings
- Evaluation and purchase of new rescue tools
- Conceptualization related to the upgrade process “SAR to USAR”
- Introduction of necessary adaptations in Management and Logistics
- National State Institute North
-
Secteur selon catégorisation du Comité d'aide au développement de l'OCDE PREVÉNTION CATASTROPHES / PRÉPARATION À LEUR SURVENUE
Sous-Secteur selon catégorisation du Comité d'aide au développement de l'OCDE Prévention des catastrophes et préparation à leur survenue
Type d'aide Contribution à des projets ou programmes
Numéro de projet 7F09318
Contexte | As the largest land-locked country in the world and being exposed to significant climatic challenges, Mongolia is vulnerable, in varying degrees, to a large number of natural disasters such as earthquakes, floods, landslides, forest fires, as well as incidents impacted by extremely harsh winters. The increasing urban environments of Ulaanbaatar, where around 50 % of the country’s total population of 3 mio. inhabitants live, as well as the cities of Darkhan and Erdenet are especially prone to earthquakes of moderate to very high intensity. |
Objectifs | NEMA’s national response capacities are strengthened and its search and rescue operations extended to urban areas according to international standards. It aims to efficiently rescuing victims trapped under rubbles of collapsed structures, as demonstrable on the adapted organizational setup, training infrastructure, equipment as well as theoretical and practical know-how. |
Groupes cibles |
Direct beneficiaries: (Urban) Search and Rescue experts and the management of NEMA Indirect beneficiaries: All urban dwellers of Mongolia, particularly those in the capital Ulaanbaatar |
Effets à moyen terme |
Outcome 1 NEMA’s USAR units own, use and maintain appropriate training facilities consisting of a Modular Training Ground (MTG), including various training stations, that enable them to practice USAR techniques according to international standards.
NEMA’s USAR units’ response capacities have been improved through introduction of systematic training of USAR techniques according to international standards, by using the partly newly purchased rescue tools, as well as through adaptations of the organizational setup and logistical infrastructure. |
Résultats |
Principaux résultats attendus: 1.1: The planning of the Modular Training Ground (MTG) has been consolidated between NEMA, SDC experts and the mandated contractor, based on the results of the pilot phase. 1.2: The construction of the Modular Training Ground (MTG) has been realized by the mandated contractor on the determined premises of NEMA’s Special Rescue Unit (SRU) near Ulaanbaatar, based on the finalized planning and with supervision of NEMA and SDC experts. 1.3: NEMA has acquired know-how on the use and maintenance of the new MTG. 2.1: NEMA’s infrastructure to store, maintain and repair the rescue tools, including the newly purchased ones, are prepared and conditioned to be used for trainings. 2.2: NEMA has carried out practical USAR trainings on site, by using the SDC donated and new, locally purchased rescue tools. 2.3: NEMA has initiated the necessary adaptions to systematically manage its USAR units during the preparedness, mobilization, deployment and demobilization phases on national base. Principaux résultats antérieurs: During the project “pilot phase” (1.7.2017-31.12.2018) the capacity building process was initiated and developed with the following achievements: |
Direction/office fédéral responsable |
DDC |
Crédit |
Aide humanitaire |
Partenaire de projet |
Partenaire contractuel Institution étatique étrangère |
Coordination avec d'autres projets et acteurs | Synergies, coordination and – as far as possible – trilateral cooperation is sought with the USAR entities of the newly established Chinese Ministry of Emergency Management (MEM). |
Budget | Phase en cours Budget de la Suisse CHF 210’000 Budget suisse déjà attribué CHF 192’017 Projet total depuis la première phase Budget de la Suisse CHF 272’448 Budget y compris partenaires de projet CHF 810’048 |
Phases du projet |
Phase
3
20.01.2023
- 31.12.2024
(Phase en cours)
Phase 2 01.01.2019 - 31.12.2019 (Active) Phase 1 01.07.2017 - 31.12.2018 (Active) |