Ukraine Direct Humanitarian Actions, Restoration of Infrastructure (WASH, Emergency)
14 months after the full-scale invasion into Ukrainian territory the areas close to the frontline and Newly Accessible Areas remain severely affected by war. International support is needed to restore essential infrastructure and keep it operational for the provision of basic water services. This second phase programme targets comprehensive WASH humanitarian response and support partners through engineering designs, material delivery and projects in WASH and WASH related emergency response activities.
Región/País | Tema | Período | Presupuesto |
---|---|---|---|
Ucrania |
Agua nothemedefined
Abastecimiento de agua
Saneamiento de agua Seguridad y diplomacia del agua |
21.06.2023
- 31.03.2025 |
CHF 9’500’000
|
- Vodakanals (VK) / State Emergency Service Ukraine (SESU) / City councils (municipalities)
- Civilian population in conflict-affected areas, with a focus on the most vulnerable dependent on public water and sanitation services
- Service providers have restored operation of their water and sewage infrastructure and improved resilience (including build-back-better)
- WASH conditions are improved in critical health facilities and public sanitation facilities
- Potential emergency situations triggered by warfare are addressed
- Restoration of damaged essential water, sanitation, heating and power infrastructure. Providing technical designs, construction material, equipment and machinery for water and sewage networks including training on that modern equipment
- Water and wastewater related emergency response is supported and/or carried out where and when appropriate
- Service Providers are supported and have enhanced capacity for project development and management
- Cuerpo Suizo de Ayuda Humanitaria
- SHA self-implementation, direct actions. Additionally, the SHA team foresees partnerships with the following INGOs and authorities: INGOs: WeWorld, Water Mission, Solidarité International, Helvetas; Authorities, including Vodakanals and water/wastewater network operators; Local and decentralised private engineering and construction companies
-
Sector según clasificación del comité de ayuda al desarrollo de la OCDE ABASTECIMIENTO DE AGUA Y SANEAMIENTO
ABASTECIMIENTO DE AGUA Y SANEAMIENTO
ABASTECIMIENTO DE AGUA Y SANEAMIENTO
Sub-Sector según clasificación del comité de ayuda al desarrollo de la OCDE Basic drinking water supply
Basic sanitation
Política de recursos hídricos y gestión administrativa
Tipo de ayuda Implementación directa COSUDE
Número de proyecto 7F11003
Contexto |
Ukraine suffers from Russian’s military aggression since the 24th of February 2022. During the occupation and specifically during the warfare in winter 2022 water and energy infrastructure were explicitly targeted. As a result of hostilities essential infrastructure is being damaged and continues to break due to hostilities and lack of maintenance. Citizens, who have stayed or have returned to the affected area, are challenged with difficult living conditions and lack of basic services, mainly in the East and South. The population in the Newly Accessible Areas (NAA) in the oblasts Kharkiv, Zaphorizhzhia, Kherson, Mykolaiv, Donetsk and along the frontline have the highest needs for humanitarian support. The uncertainty of the frontline movement, including the impact of the announced spring Ukrainian counter-offensive, requires flexible programmes to assist the most vulnerable population in the most affected areas. |
Objetivos | Restore, improve and secure the access to essential infrastructure and water services to conflict affected population. It will assist people to remain and to return to their homes. |
Grupos destinarios |
|
Efectos a medio plazo |
|
Resultados |
Resultados previstos: Resultados de las fases anteriores: Service Providers (Vodakanals and municipalities) have been enabled to repair, rehabilitate and keep essential infrastructure running. Early recovery and reconstruction projects in cities and municipalities which were accessible since November 2022 have been supported with the delivery of material. The installations of the material through the local partners have contributed to assist more than 1 Mio people. |
Dirección / Officina Federal responsable |
COSUDE |
Contrapartes del proyecto |
Contraparte del contrato |
Coordinación con otros proyectos y actores |
Coordination with other actors: Authorities, WASH cluster/UNICEF, ICRC, IOM, Danish Embassy Synergies with other projects: Sustainable Cities and Energy efficiency, Health, Small Humanitarian Direct Actions |
Presupuesto | Fase en curso Presupuesto suizo CHF 9’500’000 Presupuesto actual suizo ya emitido CHF 9’295’473 Total del proyecto desde la primera fase Presupuesto suizo CHF 3’600’000 Presupuesto inclusive contrapartes del proyecto CHF 9’300’000 |
Fases del proyecto |
Fase
3
15.01.2025
- 31.12.2027
(Fase en curso)
Fase 2 21.06.2023 - 31.03.2025 (Completed) Fase 1 20.06.2022 - 31.12.2023 (Completed) |